BESS Project
Tiln

Evergy was mandated to carry out Technical Due Diligence for the acquisition of the Tiln Battery Energy Storage System (BESS) project in the United Kingdom.

Located approximately 35 km east of Sheffield near Retford, the free-field Tiln BESS project was installed adjacent to an operational solar PV plant. The battery storage system consists of total 26 cabinets sorted into four blocks. The bigger blocks have an export/import capacity of 8.78 MW (2 x 4.39 MW), whereas the smaller blocks have a capacity of 4.39 MW. The system is connected to the grid at 132 kV voltage level. The BESS was commissioned in August 2024.

The services of Evergy comprised in particular:

  • Evaluation of the technical concept and design
  • Review of project contracts (EPC, O&M, transformer station)
  • Evaluation of warranty conditions by the battery supplier
  • Review of technical specifications of the battery system
  • Evaluation of the techno-economic operation scheme with focus on technical input parameters

Country

United Kingdom

Year of Mandate

2023

Key Technical Data

  • 25 MW / 50 MWh BESS

Services

Technical Due Diligence

Evergy Engineering GmbH » Tiln
Georg Goldes cyclist, working @evergy again since 2017
Mit Evergy verbindet mich Freundschaft. Ich begeistere mich für alle Wasserkraftprojekte habe aber auch die Erkenntnis gewonnen, dass kleine PV-Anlagen genauso komplex wie große Utility-Scale-Anlagen sind.
I simply have a friendship with Evergy. I admire all hydropower projects, but I have also come to realize that small PV systems are just as complex as large utility-scale systems.
meet Georg
Explore more Energy Storage projects