BESS Project
Tiln

Evergy was mandated to carry out Technical Due Diligence for the acquisition of the Tiln Battery Energy Storage System (BESS) project in the United Kingdom.

Located approximately 35 km east of Sheffield near Retford, the free-field Tiln BESS project was installed adjacent to an operational solar PV plant. The battery storage system consists of total 26 cabinets sorted into four blocks. The bigger blocks have an export/import capacity of 8.78 MW (2 x 4.39 MW), whereas the smaller blocks have a capacity of 4.39 MW. The system is connected to the grid at 132 kV voltage level. The BESS was commissioned in August 2024.

The services of Evergy comprised in particular:

  • Evaluation of the technical concept and design
  • Review of project contracts (EPC, O&M, transformer station)
  • Evaluation of warranty conditions by the battery supplier
  • Review of technical specifications of the battery system
  • Evaluation of the techno-economic operation scheme with focus on technical input parameters

Country

United Kingdom

Year of Mandate

2023

Key Technical Data

  • 25 MW / 50 MWh BESS

Services

Technical Due Diligence

Evergy Engineering GmbH » Tiln
Jennifer Buchner outdoor enthusiast, working @evergy since 2021
Durch meine Tätigkeit trage ich dazu bei, die Energiewende voranzubringen und leiste einen wichtigen Beitrag für die Gesellschaft und zukünftige Generationen..
Through my work the energy transition advances and I am able to make an important contribution to society and for future generations
meet Jennifer
Explore more Energy Storage projects