BESS Project
Apeldoorn

Evergy was mandated to conduct Technical Due Diligence for a Battery Energy Storage System (BESS) project under development in Apeldoorn, The Netherlands.

The BESS was planned to be installed at the border of the city of Apeldoorn, on the site of an existing solar PV plant that has been operational for two years. To accommodate the BESS, a small section of the PV installation is to be dismantled. At the time of the mandate, both the building permit and grid connection agreement were already in place. The BESS was expected to connect at the same medium-voltage interconnection point used by the existing PV plant.

The services of Evergy comprised in particular:

  • Verification of the technical concept
  • Review of technical design
  • Assessment of permitting status
  • Review of existing grid connection contract and required amendment for the BESS

Country

Netherlands

Year of Mandate

2023

Key Technical Data

  • 15 MW / 30 MWh BESS

Services

Technical Due Diligence

Evergy Engineering GmbH » Appeldorn
Christoph Boy bicyclist-commuter, working @evergy since 2017
Ich konnte bei Evergy von Anfang an eigenverantwortlich an Projekten arbeiten. Wenn Fragen auftauchen, ist immer jemand da, der einem weiter hilft oder mit dem man sich austauschen kann.
From the very beginning at Evergy, I've been able to work autonomously on projects. If I've got questions, there's always someone there to help out or to exchange ideas with.
meet Christoph
Explore more Energy Storage projects