BESS Project
Alfeld

Evergy was mandated to conduct Technical Due Diligence for the acquisition of a large-scale Battery Energy Storage System (BESS) project in Alfeld, Lower Saxony, Germany.

The project is situated near an existing high-voltage substation operated by the local DNO, Avacon, and is located on repurposed agricultural land. The system comprises 72 battery containers equipped with inverters and 36 medium-voltage transformers. Grid connection is facilitated via a project-owned high-voltage transformer station, linking to the DNO’s 110 kV switching station. At the time of the mandate, all necessary permits and grid capacity had been secured. However, the technical design was still being finalized, and contractual negotiations were ongoing.

The services of Evergy comprised in particular:

  • Analysis of site specific characteristics and evaluation of planning and environmental constraints
  • Review of grid connection status and associated infrastructure
  • Assessment of BESS operational strategies and impact on revenue streams
  • Verification of key technical inputs for financial modelling
  • Contractual review of EPC, O&M, and HV substation agreements
  • Evaluation of battery warranties and technical specifications of battery containers

Country

Germany

Year of Mandate

2023

Key Technical Data

  • 138 MW / 285 MWh BESS

Services

Technical Due Diligence

Evergy Engineering GmbH » Alfeld
Federico Ceriani musicophile, working @evergy since 2008
Für mich fühlt sich Evergy an wie ein Zuhause. Hier bin ich ein „aktiver Teil“ und das macht mich glücklich. Beim Projekt "Allt Fionn" waren die Vor-Ort-Inspektion etwas ganz Besonderes: Wir besuchten einen abgelegenen Teil Schottlands im Winter in einer schneebedeckten, kalten Umgebung. Hier haben wir unsere geballte Kompetenz eingesetzt und das positive Feedback des Kunden war toll.
Evergy feels like home to me. I am an “active part” here and that makes me happy. On the “Allt Fionn” project, the on-site inspections were very special: we visited a remote part of Scotland in winter in a cold, snow-covered environment. We used our combined expertise here and the positive feedback from the customer was great.
meet Federico
Explore more Energy Storage projects