Evergy was mandated to conduct Technical Due Diligence for the acquisition of a large-scale Battery Energy Storage System (BESS) project in Alfeld, Lower Saxony, Germany.

The project is situated near an existing high-voltage substation operated by the local DNO, Avacon, and is located on repurposed agricultural land. The system comprises 72 battery containers equipped with inverters and 36 medium-voltage transformers. Grid connection is facilitated via a project-owned high-voltage transformer station, linking to the DNO’s 110 kV switching station. At the time of the mandate, all necessary permits and grid capacity had been secured. However, the technical design was still being finalized, and contractual negotiations were ongoing.

The services of Evergy comprised in particular:

  • Analysis of site specific characteristics and evaluation of planning and environmental constraints
  • Review of grid connection status and associated infrastructure
  • Assessment of BESS operational strategies and impact on revenue streams
  • Verification of key technical inputs for financial modelling
  • Contractual review of EPC, O&M, and HV substation agreements
  • Evaluation of battery warranties and technical specifications of battery containers

Country

Germany

Year of Mandate

2023

Key Technical Data

  • 138 MW / 285 MWh BESS

Services

Technical Due Diligence

Evergy Engineering GmbH » Alfeld
Thor Fridbjörnsson green-caring individual, working @evergy since 2022
Stundum gleymum við því hvað rafmagn hjálpar okkur mikið í daglegu lífi, prófaðu að staldra við eitt andartak og hugsa hversu mikið þú notar það! 
Sometimes, we forget how much we benefit from electricity. Take a second and think about how much you use it.
meet Thor
Explore more Energy Storage projects