Evergy has been mandated with the Technical Due Diligence of the projects Tórtoles I and Tórtoles II, which were part of a larger project portfolio.

The projects Tórtoles I and Tórtoles II are two wind warms in close vicinity with a total number of 35 turbines located in the region of Castilla y León. At the time of the mandate both projects were still under development. The final wind farm layout was still to be determined, final permits were still pending. The projects comprised a quite complex grid connection design with of connection at 400 kV voltage level to the grid of Red Eléctrica de Espana,

The services of Evergy comprised in particular:

  • Full energy yield assessment for different wind farm layouts based on onsite wind measurements
  • Evaluation of the development status and of the probability of reaching Ready to Build status
  • Review of the technical design
  • Provision of CAPEX and OPEX assumptions for the financial model

Country

Spain

Year of Mandate

2022

Services

Technische Due Diligence

Technische Inspektion

Evergy Engineering GmbH » Tórtoles I & II
Jan Pinkowski runner, working @evergy since 2021
Największe wrażenie zrobił na mnie pływający park solarny Uivermeertjes. Jest to jeden z największych pływających parków fotowoltaicznych w Europie, a ja byłem tam, aby dokonać inspekcji. Pływające farmy słoneczne są technicznie wymagające i pozwalają zaoszczędzić powierzchnię na suchym lądzie.
A floating solar park Uivermeertjes has impressed me the most. It’s one of the biggest floating PV parks in Europe and I was there to make the inspection. Floating solar farms are technically challenging and allow to save area on dry land.
meet Jan