Evergy was mandated to provide Technical Due Diligence and Owner’s Engineering services for the Banie Wind Farm, a large-scale development implemented over six partially overlapping construction phases between 2015 and 2024.

The Banie project includes 96 turbines grouped into eight sub-projects, located south of Stettin, near the Germany border. At the time of engagement, the sub-projects were in development. The wind farm is connected to the Polish transmission grid via a 400 kV transformer station, through a project-owned internal grid infrastructure that includes three additional transformer stations.

The services of Evergy comprised in particular:

  • Multiple bankable energy yield assessments for different phases
  • Support in negotiating turbine supply agreements
  • Layout optimization
  • Grid curtailment impact analysis and optimization
  • Detailed electrical loss and load flow simulations using DIgSILENT PowerFactory
  • Evaluation of hybridization potential for selected project segments

Country

Poland

Year of Mandate

2015

Key Technical Data

  • 96 wind turbines, 192 MW total installed capacity

Services

Energy Forecasts

Optimisation of Existing Projects

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Banie
Georg Goldes cyclist, working @evergy again since 2017
Ein für mich persönlich beeindruckendes PV-Projekt war "Finsterwalde" in Brandenburg. Mit 42 Megawatt eines der größten Anlagen, die in 2009 in Deutschland gebaut wurden.
One project that impressed me personally was "Finsterwalde I" in Brandenburg. At 42 megawatts, it's one of the largest facilities built in Germany in 2009.
meet Georg