Evergy was commissioned to perform a Confirmatory Technical Due Diligence of five operational hydroelectric power plant schemes across Norway.

The run-of-river plants are geographically distributed between Oslo in the south and Tromsø in the north. Commissioned between November 2011 and December 2015, the plants range in nominal capacity from 1.3 MW to 5.5 MW each. All installations are connected at the medium-voltage level to the respective local distribution networks.

The services of Evergy comprised in particular:

  • Verification of the specific catchment area and hydrological flow assessments
  • Energy yield assessment based on operational data
  • Identification of technical issues affecting operational performance
  • Structural integrity verification of the power plant infrastructure
  • On-site inspection and evaluation of current technical condition
  • Preparation of a refurbishment strategy with estimated cost implications

Country

Norway

Year of Mandate

2022

Key Technical Data

  • Portfolio of 5 run-of-river hydroelectric plants with approx. 16 MW total installed capacity

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Tikraft
Federico Ceriani musicophile, working @evergy since 2008
Für mich fühlt sich Evergy an wie ein Zuhause. Hier bin ich ein „aktiver Teil“ und das macht mich glücklich. Beim Projekt "Allt Fionn" waren die Vor-Ort-Inspektion etwas ganz Besonderes: Wir besuchten einen abgelegenen Teil Schottlands im Winter in einer schneebedeckten, kalten Umgebung. Hier haben wir unsere geballte Kompetenz eingesetzt und das positive Feedback des Kunden war toll.
Evergy feels like home to me. I am an “active part” here and that makes me happy. On the “Allt Fionn” project, the on-site inspections were very special: we visited a remote part of Scotland in winter in a cold, snow-covered environment. We used our combined expertise here and the positive feedback from the customer was great.
meet Federico