Hydropower Plant
Lucchio

Evergy was appointed to conduct a comprehensive Technical Due Diligence for the acquisition of an operational hydroelectric power plant located in Tuscany, Italy. The plant has been in operation since 2008.

The Lucchio power plant is a run-of-river facility with a gross head of 68 meters. It is equipped with two Francis turbines, each with a nominal capacity of 3,600 kW, and is connected to the medium-voltage grid of the local distribution network operator.

The services of Evergy comprised in particular:

  • Verification of catchment area characteristics and flow rate assessments
  • Energy yield estimation based on historical operational data
  • Review of existing technical design and system layout
  • Site inspection and evaluation of the plant’s current technical condition
  • Development of a refurbishment plan with associated cost estimates
  • Review of existing Operation & Maintenance (O&M) contracts

Country

Italy

Year of Mandate

2024

Key Technical Data

  • 7.2 MW run-of-river hydroelectric power plant

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Lucchio
Rihab Benlyas tea lover, working @evergy since 2021
Chaque projet vient avec son lot de défis. J'ai travaillé sur l'analyse des données opérationnelles de plusieurs centaines de centrales photovoltaïques réparties dans 9 pays. Cette tâche m'a donné un aperçu de la technologie, des contraintes géographiques et de la qualité de la maintenance - tout cela sans mettre un pied à l'intérieur des centrales.
Every project comes with its challenges. I have worked on the Operational Data Analysis of several hundred PV plants spread over 9 countries. This task gave me insight on the technology, geography constraints and quality of maintenance - all without taking a single “physical” step inside the plants.
meet Rihab