Hive Portfolio

Evergy was mandated to perform Technical Due Diligence for the acquisition of a diversified portfolio comprising eight solar PV plants with a cumulative capacity of 256 MWp.

The PV assets are situated in the Emilia-Romagna region in northern Italy. The portfolio includes two projects planned with single-axis tracking systems, five with fixed-tilt structures and east-west orientation, and one floating PV installation. At the time of engagement, several plants had received permitting approval, while others were still progressing through the permitting process.

The services of Evergy comprised in particular:

  • Assessment of development status and probability of achieving “ready-to-build” status
  • Evaluation of permitting documentation and regulatory alignment
  • Recommendations for technical design optimisation
  • Feasibility analysis of design modifications with respect to permitting approval
  • Review and plausibility assessment of existing energy yield evaluations

Country

Italy

Year of Mandate

2024

Key Technical Data

  • 8 PV plants totalling 256 MWp, comprising fixed-tilt, single-axis tracker and floating PV systems

Services

Energy Forecasts

Optimisation of Existing Projects

Technical Due Diligence

Evergy Engineering GmbH » Hive
Enrico Beraldo reflective, working @evergy since 2022
Mi hanno colpito i tempi di sviluppo dei progetti, che è una cosa che non avevo mai considerato nei miei studi; ed anche il grado di complessità degli stessi, dal momento che entrano in considerazione altri aspetti oltre a quello energetico.
I am impressed by the schedule of projects, which is something I have never considered during my studies; and the degree of complexity, since several other aspects than the energetic one enter into consideration.
meet Enrico
Explore more Portfolio projects