Hydropower Plants
Derrydarroch and Upper Falloch

Evergy was appointed to carry out Technical Due Diligence in support of the acquisition process of two operational hydroelectric power plants in Scotland. Both plants have been in operation since 2015.

The Derrydarroch and Upper Falloch facilities are run-of-river systems located within the same hydrological catchment area, with gross heads ranging from 120 m to 213 m. The installed capacities are 0.9 MW and 2.0 MW respectively. Both plants are connected to the local medium-voltage distribution grid.

The services of Evergy comprised in particular:

  • Verification of the specific catchment area and flow rate assessment
  • Energy yield assessment using operational data
  • Technical design review
  • Site inspection and assessment of the current technical condition
  • Development of a refurbishment strategy with associated cost estimation
  • Review of existing Operation & Maintenance (O&M) contracts

Country

United Kingdom

Year of Mandate

2021

Key Technical Data

  • 2 run-of-river hydroelectric power plants, approx. 3 MW combined capacity

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Derrydarroch and Upper Falloch
Joshua Schwall backpacker, working @evergy since 2015
Ich bin direkt nach dem Studium zu Evergy gegangen. Dabei wurde ich sehr gut betreut und gefördert. Hier habe ich das Gefühl etwas Sinnvolles zu tun. Ich erinnere mich noch an eine Inspektionsreise nach Portugal: In der Mitte des Projektareals war ein Wasserlauf, den wir nur mit dem Geländewagen überqueren konnten und ein kleines, verlassenes Dorf, das erhalten wurde. Das war schon ungewöhnlich.
I joined Evergy straight after my studies. I received very good support and encouragement. I have the feeling that I am doing something meaningful here. I still remember an inspection trip to Portugal: in the middle of the project area was a creek that we could only cross by off-road vehicle and a small, deserted village which was preserved. That was quite unusual.
meet Joshua
Explore more Hydro projects