Wind Farm
Demircili

Evergy was mandated to carry out a technical audit of the Demircili Wind Farm as part of a certification process.

The wind farm is located on the Çeşme peninsula near Izmir, approximately 2 km from the coastline in western Turkey. It comprises 16 turbines of type Nordex N100 and N90, commissioned in 2016. The facility is connected to the grid via an overhead line constructed by Nordex, which links to the Urla II transformer substation.

The services of Evergy comprised in particular:

  • Design review of the wind farm layout
  • Review of site specific load assessments and determination of the technical life time
  • Technical evaluation of the turbine types
  • Assessment of turbine suitability under local ambient conditions
  • Review of operation contracts
  • Assessment of turbine suitability under local ambient conditions
  • Analysis of operational performance data

Country

Turkey

Year of Mandate

2022

Key Technical Data

  • 16 wind turbines type Nordex N100 / N90

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Demircili
Stefano Tadini handyman, working @evergy since 2009
Lavoriamo per molti player di mercato e otteniamo una vasta panoramica sul settore. Mi piace molto alternare il lavoro d’ufficio con visite in sito.
Working with different market players means we have a very good overview of the sector. I really appreciate the mix between daily life in the office and travel to site visits.
meet Stefano