Hive Portfolio

Evergy was mandated to perform Technical Due Diligence for the acquisition of a diversified portfolio comprising eight solar PV plants with a cumulative capacity of 256 MWp.

The PV assets are situated in the Emilia-Romagna region in northern Italy. The portfolio includes two projects planned with single-axis tracking systems, five with fixed-tilt structures and east-west orientation, and one floating PV installation. At the time of engagement, several plants had received permitting approval, while others were still progressing through the permitting process.

The services of Evergy comprised in particular:

  • Assessment of development status and probability of achieving “ready-to-build” status
  • Evaluation of permitting documentation and regulatory alignment
  • Recommendations for technical design optimisation
  • Feasibility analysis of design modifications with respect to permitting approval
  • Review and plausibility assessment of existing energy yield evaluations

Country

Italy

Year of Mandate

2024

Key Technical Data

  • 8 PV plants totalling 256 MWp, comprising fixed-tilt, single-axis tracker and floating PV systems

Services

Energy Forecasts

Optimisation of Existing Projects

Technical Due Diligence

Evergy Engineering GmbH » Hive
Georg Goldes cyclist, working @evergy again since 2017
Mit Evergy verbindet mich Freundschaft. Ich begeistere mich für alle Wasserkraftprojekte habe aber auch die Erkenntnis gewonnen, dass kleine PV-Anlagen genauso komplex wie große Utility-Scale-Anlagen sind.
I simply have a friendship with Evergy. I admire all hydropower projects, but I have also come to realize that small PV systems are just as complex as large utility-scale systems.
meet Georg
Explore more Portfolio projects