Evergy was engaged to perform Technical Due Diligence and provide comprehensive technical consultancy services for the acquisition of a portfolio of 53 operational solar PV assets within a tight timeframe of approximately eight weeks.

At the time, this was the UK’s largest transaction involving operational PV assets, valued at approximately GBP 700 million. The portfolio was acquired by a private market fund managed by the Client alongside a third-party co-investor. The asset base consists of 52 ground-mounted and one rooftop PV installation, utilizing various components from key industry manufacturers. The plants were originally commissioned between 2014 and 2017.

The services of Evergy comprised in particular:

  • Identification of major technical risks and recommendation of mitigation measures
  • Analysis of plant-level operational data (irradiation, energy yield, technical availability)
  • Energy yield assessment based on operational data
  • Technical inspections to determine current condition and required repair works
  • Provision of OPEX assumptions for financial modelling
  • Estimation of remaining operational lifetime for all plants

Country

United Kingdom

Year of Mandate

2024

Key Technical Data

  • 514 MWp portfolio comprising 53 operational PV plants

Services

Energy Forecasts

Optimisation of Existing Projects

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Toucan
Thorsten Nogge biker, working @evergy since 2004
Eines der ältesten Projekte ist Miegersbach (2005). Das war sehr innovativ damals – eine große Anlage. In extrem kurzer Zeit haben alle Beteiligten hochmotiviert daran gearbeitet und es perfekt umgesetzt.
One of the oldest projects is Miegersbach (2005). At the time it was really ground breaking – a big plant. Within a very short time everyone who was working on it was highly motivated and the project was completed perfectly.
meet Thorsten