Evergy was appointed to carry out Technical Due Diligence in support of the acquisition process of two operational hydroelectric power plants in Scotland. Both plants have been in operation since 2015.

The Derrydarroch and Upper Falloch facilities are run-of-river systems located within the same hydrological catchment area, with gross heads ranging from 120 m to 213 m. The installed capacities are 0.9 MW and 2.0 MW respectively. Both plants are connected to the local medium-voltage distribution grid.

The services of Evergy comprised in particular:

  • Verification of the specific catchment area and flow rate assessment
  • Energy yield assessment using operational data
  • Technical design review
  • Site inspection and assessment of the current technical condition
  • Development of a refurbishment strategy with associated cost estimation
  • Review of existing Operation & Maintenance (O&M) contracts

Country

United Kingdom

Year of Mandate

2021

Key Technical Data

  • 2 run-of-river hydroelectric power plants, approx. 3 MW combined capacity

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Derrydarroch and Upper Falloch
Trishita Bhattacharjee traveller, working @evergy since 2020
আমি একটি নির্দিষ্ট প্রকল্প মনে করি: Bryn Henllys EYA. এটাতে কাজ করা আমার জন্য খুবই নতুন ছিল। তবে সহকর্মীদের কাছ থেকে প্রচুর সমর্থন নিয়ে এটিতে কাজ করতে আমি অনেক উপভোগ করেছি।
I remember a particular project: Bryn Henllys EYA. It was very new for me to work on it. But I enjoyed a lot working on it with a lot of support from the colleagues.
meet Trishita
Explore more Hydro projects