Hydropower Plants
Derrydarroch and Upper Falloch

Evergy was appointed to carry out Technical Due Diligence in support of the acquisition process of two operational hydroelectric power plants in Scotland. Both plants have been in operation since 2015.

The Derrydarroch and Upper Falloch facilities are run-of-river systems located within the same hydrological catchment area, with gross heads ranging from 120 m to 213 m. The installed capacities are 0.9 MW and 2.0 MW respectively. Both plants are connected to the local medium-voltage distribution grid.

The services of Evergy comprised in particular:

  • Verification of the specific catchment area and flow rate assessment
  • Energy yield assessment using operational data
  • Technical design review
  • Site inspection and assessment of the current technical condition
  • Development of a refurbishment strategy with associated cost estimation
  • Review of existing Operation & Maintenance (O&M) contracts

Country

United Kingdom

Year of Mandate

2021

Key Technical Data

  • 2 run-of-river hydroelectric power plants, approx. 3 MW combined capacity

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Derrydarroch and Upper Falloch
Marc Böhnke sailor, working @evergy since 2007
Die Erwartungen unserer Kunden sind hoch, die müssen und wollen wir auch erfüllen. Das geht nur durch persönliches Engagement und Fokus auf die Kundenbedürfnisse.
Our clients’ expectations are high and we have to, and want to, fulfill them. This can only be achieved through personal commitment and a focus on our clients’ needs.
meet Marc
Explore more Hydro projects