Hydropower Plants
Derrydarroch and Upper Falloch

Evergy was appointed to carry out Technical Due Diligence in support of the acquisition process of two operational hydroelectric power plants in Scotland. Both plants have been in operation since 2015.

The Derrydarroch and Upper Falloch facilities are run-of-river systems located within the same hydrological catchment area, with gross heads ranging from 120 m to 213 m. The installed capacities are 0.9 MW and 2.0 MW respectively. Both plants are connected to the local medium-voltage distribution grid.

The services of Evergy comprised in particular:

  • Verification of the specific catchment area and flow rate assessment
  • Energy yield assessment using operational data
  • Technical design review
  • Site inspection and assessment of the current technical condition
  • Development of a refurbishment strategy with associated cost estimation
  • Review of existing Operation & Maintenance (O&M) contracts

Country

United Kingdom

Year of Mandate

2021

Key Technical Data

  • 2 run-of-river hydroelectric power plants, approx. 3 MW combined capacity

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Derrydarroch and Upper Falloch
Jennifer Buchner outdoor enthusiast, working @evergy since 2021
In einem meiner Projekte wurde eine Blattwinkelkorrektur an einzelnen Turbinen durchgeführt. Um festzustellen, ob sich die Betriebsdaten dadurch verbessert haben, habe ich ein Auswertungstool in Python programmiert. Solche analytischen und mathematischen Aufgaben machen mir Spaß.
In one of my projects, a blade angle correction was carried out on individual turbines. In order to determine whether the operating data has improved, I programmed an evaluation tool in Python. I enjoy such analytical and mathematical tasks.
meet Jennifer
Explore more Hydro projects