Hydropower Plant
Lucchio

Evergy was appointed to conduct a comprehensive Technical Due Diligence for the acquisition of an operational hydroelectric power plant located in Tuscany, Italy. The plant has been in operation since 2008.

The Lucchio power plant is a run-of-river facility with a gross head of 68 meters. It is equipped with two Francis turbines, each with a nominal capacity of 3,600 kW, and is connected to the medium-voltage grid of the local distribution network operator.

The services of Evergy comprised in particular:

  • Verification of catchment area characteristics and flow rate assessments
  • Energy yield estimation based on historical operational data
  • Review of existing technical design and system layout
  • Site inspection and evaluation of the plant’s current technical condition
  • Development of a refurbishment plan with associated cost estimates
  • Review of existing Operation & Maintenance (O&M) contracts

Country

Italy

Year of Mandate

2024

Key Technical Data

  • 7.2 MW run-of-river hydroelectric power plant

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Lucchio
Pierre Dutilleux sailor, working @evergy since 2010
Das Arbeitsklima im ehrwürdigen großen alten Haus mit Garten - das ist Evergy. Seit Jahren arbeite ich an Leuchtturmprojekten, bei denen ich die Beteiligten vor verborgenen Risiken schütze. Es ist anspruchsvoll, voller Überraschungen und abwechslungsreich.
The working atmosphere in a grand old house with a garden - that's Evergy. I've been working on lighthouse projects for years, protecting those involved from hidden risks. It's challenging, full of surprises and varied.
meet Pierre