BESS Project
Tiln

Evergy was mandated to carry out Technical Due Diligence for the acquisition of the Tiln Battery Energy Storage System (BESS) project in the United Kingdom.

Located approximately 35 km east of Sheffield near Retford, the free-field Tiln BESS project was installed adjacent to an operational solar PV plant. The battery storage system consists of total 26 cabinets sorted into four blocks. The bigger blocks have an export/import capacity of 8.78 MW (2 x 4.39 MW), whereas the smaller blocks have a capacity of 4.39 MW. The system is connected to the grid at 132 kV voltage level. The BESS was commissioned in August 2024.

The services of Evergy comprised in particular:

  • Evaluation of the technical concept and design
  • Review of project contracts (EPC, O&M, transformer station)
  • Evaluation of warranty conditions by the battery supplier
  • Review of technical specifications of the battery system
  • Evaluation of the techno-economic operation scheme with focus on technical input parameters

Country

United Kingdom

Year of Mandate

2023

Key Technical Data

  • 25 MW / 50 MWh BESS

Services

Technical Due Diligence

Evergy Engineering GmbH » Tiln
Stefano Tadini handyman, working @evergy since 2009
Lavoriamo per molti player di mercato e otteniamo una vasta panoramica sul settore. Mi piace molto alternare il lavoro d’ufficio con visite in sito.
Working with different market players means we have a very good overview of the sector. I really appreciate the mix between daily life in the office and travel to site visits.
meet Stefano
Explore more Energy Storage projects