Evergy delivered a bankable Technical Due Diligence report prior to the construction of the Talayuela PV Plant and continued to support the client with lender’s technical advisory services during the construction phase. Since commissioning, Evergy has provided ongoing technical controlling services.

Talayuela is part of a Spanish PV portfolio of approximately 500 MWp, located in the Cáceres region (Extremadura). At the time of the mandate, the project was still under development. Part of the project was a newly erected large scale grid connection infrastructure at 400 kV voltage level to the grid of Red Eléctrica de Espana. Talayuela's connection infrastructure is shared with seven other PV plants with a total capacity of approx. 618 MWp.

The services of Evergy comprised in particular:

  • Lender's Technical Due Diligence
  • Support in negotiation of supply agreements (EPC PV, EPC grid)
  • Calculation of hourly production profile to determine PPA pre-defined hedge quantities
  • Construction supervision with regular site visits and detailed delay risk analysis
  • Technical inspections at acceptance (PAC and FAC)

Country

Spain

Year of Mandate

2018

Key Technical Data

  • 300 MWp, single-axis trackers

Services

Energy Forecasts

Optimisation of Existing Projects

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Talayuela
Dirk Zeyringer Walker, working @evergy since 2007
Ein Projekt an dem ich gerne mitgewirkt habe, ist der Solarpark Gamma in Rumänien. Es war für das Land eines der ersten großen Solarkraftwerke, welches an das Hochspannungsnetz angeschlossen wurde.
One project I really enjoyed working on was the Gamma solar park in Romania. It was one of the first really big solar parks to be connected to the high voltage power grid in the country.
meet Dirk