Hybrid Project
Scruf Dyke

Evergy provided comprehensive lender’s technical due diligence services for the Scurf Dyke Hybrid Power Plant in the UK. The scope included a detailed review of construction timelines, technology selection, permitting, grid connection arrangements, financial model assumptions, ESG compliance, and all key project contracts.

The Scurf Dyke project comprises an 80 MWp solar PV plant integrated with an 8 MW / 16 MWh battery energy storage system (BESS)—the largest of its kind in the UK at the time of engagement. The project was in the development stage and required close coordination among the developer, equity investor, and debt provider.

The services of Evergy comprised in particular:

  • Lender's Technical Due Diligence
  • Construction monitoring with regular site inspections and detailed risk analysis
  • Technical inspections at key milestones (Provisional and Final Acceptance - PAC and FAC)

Country

United Kingdom

Year of Mandate

2024

Key Technical Data

  • 80 MWp PV Plant, 8 MW / 16 MWh BESS

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Scurf Dyke
Enrico Beraldo reflective, working @evergy since 2022
Mi hanno colpito i tempi di sviluppo dei progetti, che è una cosa che non avevo mai considerato nei miei studi; ed anche il grado di complessità degli stessi, dal momento che entrano in considerazione altri aspetti oltre a quello energetico.
I am impressed by the schedule of projects, which is something I have never considered during my studies; and the degree of complexity, since several other aspects than the energetic one enter into consideration.
meet Enrico