Floating PV Plant
Odehaske II

Evergy was appointed to perform Technical Due Diligence prior to the construction of the Floating PV Plant Oudehaske II and subsequently served as the lender's engineer during the construction and acceptance phases.

The project is located between the cities of Heerenveen and Joure in the province of Friesland and is constructed over a sand excavation lake, with excavation still ongoing in some parts. The total project area spans approximately 13 hectares. Oudehaske II is designed with dual-orientation fixed frames supporting P-type mono-crystalline dual-glass PV modules, connected via string inverters to a 21 kV medium-voltage grid. The solar arrays are installed at a 12° tilt angle and oriented east (-107°) and west (73°).

The services of Evergy comprised in particular:

  • Energy yield verification considering the technical challenges in relation to the interaction of the PV Plant and the water body (i.e. soiling, cooling)
  • Development of a cost-efficient module cleaning procedure
  • Technical design review
  • Review of the project specific procurement and operational contracts
  • Technical inspections at acceptance (PAC and FAC)

Country

Netherlands

Year of Mandate

2023

Key Technical Data

  • 21 MWp, Floating-PV

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Odehaske II
Tejas Kuber science buff, working @evergy since 2015
इंग्लंडमध्ये "पेनिके" हा एक चांगला प्रकल्प होता. तो आकारात फार मोठा न्हवता, परंतु मी सुरुवातीपासून प्रकल्पाचा प्रत्येक टप्प्यात साहबगही होतो, साइटवर देखील. मला संपूर्ण प्रक्रियेचे एक चांगले विहंगावलोकन मिळाले.
"Penycae" in England was a great project. It wasn’t huge in size, but I was involved from the start and actively supported it at every project stage, including on-site. I ended up getting a great overview of the entire process.
meet Tejas