Hydropower Plant
Lucchio

Evergy was appointed to conduct a comprehensive Technical Due Diligence for the acquisition of an operational hydroelectric power plant located in Tuscany, Italy. The plant has been in operation since 2008.

The Lucchio power plant is a run-of-river facility with a gross head of 68 meters. It is equipped with two Francis turbines, each with a nominal capacity of 3,600 kW, and is connected to the medium-voltage grid of the local distribution network operator.

The services of Evergy comprised in particular:

  • Verification of catchment area characteristics and flow rate assessments
  • Energy yield estimation based on historical operational data
  • Review of existing technical design and system layout
  • Site inspection and evaluation of the plant’s current technical condition
  • Development of a refurbishment plan with associated cost estimates
  • Review of existing Operation & Maintenance (O&M) contracts

Country

Italy

Year of Mandate

2024

Key Technical Data

  • 7.2 MW run-of-river hydroelectric power plant

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Lucchio
Marc Böhnke sailor, working @evergy since 2007
Die Internationalisierung der letzten Jahre finde ich spannend. Dadurch ergeben sich neue Kundengruppen und Wachstumsregionen.
The internationalization we’ve seen over the past few years is exciting. It’s opened up new client groups and growth regions.
meet Marc