BESS Project
Apeldoorn

Evergy was mandated to conduct Technical Due Diligence for a Battery Energy Storage System (BESS) project under development in Apeldoorn, The Netherlands.

The BESS was planned to be installed at the border of the city of Apeldoorn, on the site of an existing solar PV plant that has been operational for two years. To accommodate the BESS, a small section of the PV installation is to be dismantled. At the time of the mandate, both the building permit and grid connection agreement were already in place. The BESS was expected to connect at the same medium-voltage interconnection point used by the existing PV plant.

The services of Evergy comprised in particular:

  • Verification of the technical concept
  • Review of technical design
  • Assessment of permitting status
  • Review of existing grid connection contract and required amendment for the BESS

Country

Netherlands

Year of Mandate

2023

Key Technical Data

  • 15 MW / 30 MWh BESS

Services

Technical Due Diligence

Evergy Engineering GmbH » Appeldorn
Thor Fridbjörnsson green-caring individual, working @evergy since 2022
Að starfa í orkugeiranum um alla Evrópu hefur verið draumur minn í langan tíma og núna hefur hann heldur betur ræst!
Working on energy projects all around Europe has been my dream for a long time and now it´s true!
meet Thor
Explore more Energy Storage projects