Wind Farms
Tórtoles I & II

Evergy was mandated to perform Technical Due Diligence for the wind energy projects Tórtoles I and Tórtoles II, which formed part of a broader renewable energy portfolio that also included two PV plants with a combined capacity of 115 MWp.

Both wind farms are situated in close proximity within the Castilla y León region and together consist of 35 turbines. At the time of engagement, the projects were still in the development phase—final layouts were under consideration and key permits were yet to be received. The infrastructure design involved a complex, shared grid system integrating multiple wind and PV plants, with several switching and transformer stations connected to the 400 kV grid operated by Red Eléctrica de España.

The services of Evergy comprised in particular:

  • Bankable energy yield assessment for alternative wind farm layouts using onsite wind measurements
  • Evaluation of the Project's development status and of the probability of reaching Ready to Build status
  • Assessment of permitting status of the shared grid infrastructure
  • Review of the technical design documentation
  • Provision of CAPEX and OPEX estimates for integration into the financial model

Country

Spain

Year of Mandate

2022

Key Technical Data

  • 35 wind turbines, approx. 210 MW total capacity

Services

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Tórtoles I & II
Stefano Tadini handyman, working @evergy since 2009
I miei compiti in Evergy sono molto diversificati; non mi annoio mai.
I work on a very broad range of tasks so it never gets boring.
meet Stefano