Hydropower Plant
Lucchio

Evergy was appointed to conduct a comprehensive Technical Due Diligence for the acquisition of an operational hydroelectric power plant located in Tuscany, Italy. The plant has been in operation since 2008.

The Lucchio power plant is a run-of-river facility with a gross head of 68 meters. It is equipped with two Francis turbines, each with a nominal capacity of 3,600 kW, and is connected to the medium-voltage grid of the local distribution network operator.

The services of Evergy comprised in particular:

  • Verification of catchment area characteristics and flow rate assessments
  • Energy yield estimation based on historical operational data
  • Review of existing technical design and system layout
  • Site inspection and evaluation of the plant’s current technical condition
  • Development of a refurbishment plan with associated cost estimates
  • Review of existing Operation & Maintenance (O&M) contracts

Country

Italy

Year of Mandate

2024

Key Technical Data

  • 7.2 MW run-of-river hydroelectric power plant

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Lucchio
Christoph Boy bicyclist-commuter, working @evergy since 2017
Mich fasziniert, dass man auch nach 20 Jahren in dieser Branche immer noch neue Sachen kennenlernt, dazu gehört auch mein erstes Stand-Alone-Batterieprojekt.
What fascinates me is that even after 20 years in this industry, you still learn new things, including my first stand-alone battery project.
meet Christoph