Wind Farm
Demircili

Evergy was mandated to carry out a technical audit of the Demircili Wind Farm as part of a certification process.

The wind farm is located on the Çeşme peninsula near Izmir, approximately 2 km from the coastline in western Turkey. It comprises 16 turbines of type Nordex N100 and N90, commissioned in 2016. The facility is connected to the grid via an overhead line constructed by Nordex, which links to the Urla II transformer substation.

The services of Evergy comprised in particular:

  • Design review of the wind farm layout
  • Review of site specific load assessments and determination of the technical life time
  • Technical evaluation of the turbine types
  • Assessment of turbine suitability under local ambient conditions
  • Review of operation contracts
  • Assessment of turbine suitability under local ambient conditions
  • Analysis of operational performance data

Country

Turkey

Year of Mandate

2022

Key Technical Data

  • 16 wind turbines type Nordex N100 / N90

Services

Energy Forecasts

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Demircili
Federico Ceriani musicophile, working @evergy since 2008
Für mich fühlt sich Evergy an wie ein Zuhause. Hier bin ich ein „aktiver Teil“ und das macht mich glücklich. Beim Projekt "Allt Fionn" waren die Vor-Ort-Inspektion etwas ganz Besonderes: Wir besuchten einen abgelegenen Teil Schottlands im Winter in einer schneebedeckten, kalten Umgebung. Hier haben wir unsere geballte Kompetenz eingesetzt und das positive Feedback des Kunden war toll.
Evergy feels like home to me. I am an “active part” here and that makes me happy. On the “Allt Fionn” project, the on-site inspections were very special: we visited a remote part of Scotland in winter in a cold, snow-covered environment. We used our combined expertise here and the positive feedback from the customer was great.
meet Federico