Evergy provided Technical Due Diligence services for the acquisition of the Bartow PV Plant and continued to support the Client as Owner’s Engineer throughout the procurement and construction phases.

The Bartow project comprises two PV subsystems with capacities of 200 MWp and 60 MWp, respectively. Both systems are connected to the 380 kV transmission grid through a dedicated medium-voltage cable route and a project-owned 30/380 kV transformer station. Construction of the PV plant commenced in Q1 2024, with commercial operation (COD) planned in Q3 2025.

The services of Evergy comprised in particular:

  • Technical assistance in EPC tender evaluation
  • Support during EPC and O&M contract negotiations
  • Review and approval of detailed EPC engineering design
  • Construction monitoring during project execution
  • Technical inspections at key milestones (PAC and FAC)

Country

Germany

Year of Mandate

2022

Key Technical Data

  • Freefield PV plant with an installed capacity of approx. 260 MWp

Services

Energy Forecasts

Project Planning

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Bartow
Georg Goldes cyclist, working @evergy again since 2017
Mit Evergy verbindet mich Freundschaft. Ich begeistere mich für alle Wasserkraftprojekte habe aber auch die Erkenntnis gewonnen, dass kleine PV-Anlagen genauso komplex wie große Utility-Scale-Anlagen sind.
I simply have a friendship with Evergy. I admire all hydropower projects, but I have also come to realize that small PV systems are just as complex as large utility-scale systems.
meet Georg