Evergy was mandated to provide Technical Due Diligence and Owner’s Engineering services for the Banie Wind Farm, a large-scale development implemented over six partially overlapping construction phases between 2015 and 2024.

The Banie project includes 96 turbines grouped into eight sub-projects, located south of Stettin, near the Germany border. At the time of engagement, the sub-projects were in development. The wind farm is connected to the Polish transmission grid via a 400 kV transformer station, through a project-owned internal grid infrastructure that includes three additional transformer stations.

The services of Evergy comprised in particular:

  • Multiple bankable energy yield assessments for different phases
  • Support in negotiating turbine supply agreements
  • Layout optimization
  • Grid curtailment impact analysis and optimization
  • Detailed electrical loss and load flow simulations using DIgSILENT PowerFactory
  • Evaluation of hybridization potential for selected project segments

Country

Poland

Year of Mandate

2015

Key Technical Data

  • 96 wind turbines, 192 MW total installed capacity

Services

Energy Forecasts

Optimisation of Existing Projects

Technical Due Diligence

Technical Inspection

Evergy Engineering GmbH » Banie
Rihab Benlyas tea lover, working @evergy since 2021
Après avoir travaillé dans un laboratoire de recherche pendant quelques années, j'ai voulu m'impliquer dans le secteur des énergies renouvelables à une échelle plus concrète. Aujourd'hui, je suis fière d'aider au développement, à la construction et à l'exploitation de projets d'énergies renouvelables, en tant que consultante.
After working in a laboratory for some years, I wanted to be involved in the field of renewable energies on a more tangible scale. Now, I am proud to assist with the development, construction, and operation of renewable energy projects, from a technical consultant’s point of view.
meet Rihab